Telmaco Borba

Plant Hidroeltrica de Mau the Brazilian government, already thinking about possible future necessities of supplying of electric energy, started the construction of new hidroeltricas plants, one of them is the plant Hidroeltrica de Mau. The workmanship of the plant of Mau initiated the construction in 2008, aiming at to the conclusion to the 2011 end. This great workmanship will have a strong ambient and economic impact, affecting directly all the region of Telmaco Borba and Ortigueira. Read more here: Daniel Gilbert. Until point this workmanship can be beneficial to the population? The ambient impact is evident, since the workmanship will go to modify topography of the region, modifying the course river Tibagi, flooding a great area, creating a reservoir of 84 km. Had this overflow and the creation of the reservoir, great portions of land that sheltered or were used for economic ends for 378 families will become uninhabitable, compelling the marginal population to vacate the place. These families will be indemnified, being that a quarrel exists so that if arrives at an agreement on the criteria and values to be paid. The plant will have capacity of production of 361 MW of installed power, being enough to supply a population of 1 million of people, what the energy supplying will represent a security in relation. As reflected immediate this workmanship is generating 1500 jobs more than right-handers and 3000 indirect ones, amongst them commerce, restaurants, transports and lodgings, etc., alavancando the economy in the region, despertando in the marginal population the empreendedorismo spirit.. about the problem.